News from ETSON and its members*
News from ETSON and its members*
During the month of June 2020 several anomalous measurements of radioactive nuclides have been recorded in Scandinavia and Eastern Europe. ENEA has performed isotopic ratios and atmospheric dispersion analyses in order to pinpoint a possible region of origin of the radioactive material.
From October 2017, the Consortium Westinghouse Electric Spain, Westinghouse Electric Sweden and VUJE is implementing the Project: “D4.2 Dismantling of Reactor Coolant System Large Components” being one of the most important project of V1 Nuclear Power Plant (two units with VVER– 440 reactors located in Jaslovské Bohunice site in Slovakia) decommissioning process managed by Slovak company Jadrová a vyraďovacia spoločnosť (JAVYS, a.s.) and co-funded by the European Union through the European Bank for Reconstruction and Development (EBRD). Project has to be developed in a tight period, and this has resulted in the design of specific technical strategies and solutions.
Specially designed and manufactured equipment is being used to perform underwater segmentation of the first ever VVER-440 reactor to be decommissioned.
In the years 2018 to 2020, the company VUJE, a.s. supplied the system for monitoring the concentration of hydrogen in the containment for beyond design basis accidents in Rivne Nuclear Power Plant (RNPP) Units 3 and 4. The system was delivered to RNPP as part of the implementation of measures within the Complex Consolidated Safety Upgrade Program for the Ukraine Nuclear Power Plants.
Jacobs, the global technology-forward solutions company, is supporting the development of a new type of nuclear power plant.
VUJE completed delivery of brand-new manipulator for remote controlled plugging of VVER-440 steam generator heat exchanging tubes. Based on extensive experience with development of this kind of equipment VUJE presented turnkey solution, customized to Hungarian Paks NPP requirements.
Following its acquisition of Wood Nuclear in March 2020, global technology-forward solutions company Jacobs is the UK member of Eurosafe
Research by an international consortium could lead to extensions in the operational lifespan of nuclear power plants around the world. The INCEFA-SCALE programme aims to reduce uncertainties about how critical components will perform when subjected to the harsh conditions inside operational reactors.
One of the key duties of a nuclear safety authority is to ascertain the nuclear facility safety.
MYRRHA (Multipurpose hYbrid Research Reactor for High-tec Applications) is a unique highly innovative prototype of a nuclear reactor driven by a high power linear accelerator. It will be designed to operate in both critical (no accelerator needed) and subcritical mode. MYRRHA has a fast spectrum core cooled by Lead Bismuth Eutectic (LBE).
Copyright · All rights reserved