• Slider Banner

    GRS research projects on nuclear safety in Ukraine: Simulations and scenarios of severe VVER reactor accidents

    Read more
  • Slider Banner

    The PIANOFORTE partnership selects topics for its 1st call for proposals on radiation protection

    Read more
  • Slider Banner

    Full System Decontamination of the primary circuit at Doel 3 NPP: safety assessment by Bel V

    Read more
  • Slider Banner

    ASTEC extends its functionalities to additional types of nuclear facilities

    Read more
  • Slider Banner

    Forensics: Quantitative tracing of Silicon in CRUD

    Read more

News from ETSON and its members*

22 Sep 2021 | Vuje

From October 2017, the Consortium Westinghouse Electric Spain, Westinghouse Electric Sweden and VUJE is implementing the Project: “D4.2 Dismantling of Reactor Coolant System Large Components” being a crucial part of V1 Nuclear Power Plant (two units with VVER– 440 reactors located in Jaslovské Bohunice site in Slovakia) decommissioning process managed by Slovak company Jadrová a vyraďovacia spoločnosť (JAVYS) and co-funded by the European Union through the European Bank for Reconstruction and Development.

22 Sep 2021 | SSTC NRS

From 1 to 19 September this year, joint international radiation monitoring exercises were held in the Chornobyl Exclusion Zone (CEZ) under a project of the German Federal Office for Radiation Protection and State Specialized Enterprise “Ecocenter” with the assistance of the German Embassy in Ukraine. The objective was to prepare an up-to-date map showing the distribution of Cs-137 radiation contamination and predict the nature of its changes.

22 Sep 2021 | Jacobs

Tucked away on a quiet industrial estate near Manchester Airport, a key test facility has helped to keep the UK’s nuclear power stations running for more than 40 years.
The Wythenshawe Boiler Rig, owned by EDF and operated by Jacobs, has provided an in-depth understanding of what was happening and what might happen inside advanced gas-cooled reactor (AGR) boilers. 

22 Sep 2021 | Vuje

Aerial inspections of electric overhead lines are a suitable tool to increase their reliability and thus also have an impact on increasing the reliability of the operation of nuclear power plants.

22 Sep 2021 | SSTC NRS

According to the management of the State Scientific and Technical Center for Nuclear and Radiation Safety (SSTC NRS), training and improvement of knowledge and skills are not only current requirements, but also an integral part of daily activity. Being guided by this paradigm, SSTC NRS actively develops the popular work area such as education and training for experts of institutions and organizations acting in the field of nuclear energy and participates in various domestic and international educational projects.

22 Sep 2021 | Jacobs

Jacobs is embarking on a programme of advanced structural integrity testing that will give a better understanding of the fatigue behaviour of real plant components in light water power reactors.

22 Sep 2021 | Vuje

Hydrogen Concentration Measurement System (HCMS) of 3rd generation for NPPs operating with VVER-440, VVER-1000 reactor types, designed and qualified for LOCA and severe accidents.

22 Sep 2021 | Jacobs

Radioactive waste often has to be encapsulated for long-term storage. Usually, it’s placed in a steel drum that is filled with cement. But now there is a lower cost and more environmentally friendly option: SIAL®, a geopolymer encapsulation technology developed by Jacobs.

30 Aug 2021 | PSI

Switzerland plans to construct an underground repository for its radioactive waste by 2050. Three sites are under consideration. Researchers at PSI are providing data that will help in determining which is most suitable.

30 Aug 2021 | ENEA

Instead of automated sampling for noble gases and analysing stations, manual system can be used to better accommodate costs for the equipment and flexibility of usage. One of this system has been developed by the Traceability Laboratory at the ENEA Research center of Brasimone, which was specially designed in order to keep the sampling equipment separate from the processing and measurement.

 

 

* The responsibility for the content of news provided by ETSON member organisation lies solely with the respective ETSON member. The views and opinions expressed in news content provided by ETSON member organisations do not necessarily reflect those of ETSON.

 

Stay informed - subscribe to our newsletter.

Stay informed - subscribe to our newsletter.
The subscriber's email address.