• Slider Banner

    VUJE supplies monitoring system to Hanhikivi-1 nuclear power plant

    Read more
  • Slider Banner

    Chornobyl NPP Received a License to Operate Confinement and Shelter System

    Read more
  • Slider Banner

    CHIMERA – a crucial component in developing commercial fusion energy

    Read more
  • Slider Banner

    Current status in decommissioning of V1 NPP primary circuit contaminated components

    Read more
  • Slider Banner

    International Exercises to Test Radiation Monitoring Technique Held in the Chornobyl Exclusion Zone

    Read more
  • Slider Banner

    After 42 years, tried and tested boiler rig finally runs out of steam

    Read more
  • Slider Banner

    Aerial inspections of power lines contribute to the reliability of the operation of nuclear power plants

    Read more
  • Slider Banner

    Training, Professional Development, Experience Exchange: Preconditions for Efficient Performance in the Field of Nuclear and Rad

    Read more
  • Slider Banner

    Multi-dimensional testing aims to bridge knowledge gaps, improve operational availability and safety of nuclear plant

    Read more
  • Slider Banner

    HYDROGEN CONCENTRATION MEASURING SYSTEM (HCMS)

    Read more
  • Slider Banner

    SIAL® makes waste encapsulation better for the environment

    Read more
  • Slider Banner

    ETSON and IAEA cooperate to strengthen capabilities of Technical and Scientific Support Organisations worldwide

    Read more

News from ETSON and its members*

16 Jan 2020 | NRA

The seawall is one of the main coastal protection structures against tsunamis. Estimating tsunami wave pressures on a structure is quite important when designing seawalls.

16 Jan 2020 | NRA

Uranium is an important nuclear material and contaminant with respect to the sites of uranium mining and whole nuclear facilities.

16 Jan 2020 | NRA

The regulatory guide for reviewing the licensee's technical report for the extension of the operating period of commercial power reactors, enacted in November 2013, requires evaluation of the proof stress of the concrete structures of nuclear power plants operated for more than 40 years if the neutron fluence exceeds or may exceed a certain limit where neutron irradiation affects the concrete strength.

16 Jan 2019 | NRA

A new risk-informed and performance-based inspection program will be enacted from April 2020. A part of this program builds on the information obtained from a probabilistic risk assessment (PRA).

 

 

* The responsibility for the content of news provided by ETSON member organisation lies solely with the respective ETSON member. The views and opinions expressed in news content provided by ETSON member organisations do not necessarily reflect those of ETSON.

 

Stay informed - subscribe to our newsletter.

The subscriber's email address.